Infrastructure

Saurino Bridges

Project Status: 
Completion Date: 
2010
Industry: 
Type: 
Description: 
Execution of the construction of two bridges located on the Muconda / Luau axes in the Province of Lunda Sul and Quibala / Ponte do Keve in the Province of Kwanza Sul, Angola, bridges with concrete structure and post-stressed beams, two-way, with berm and handrails, 11 meters in width and of the following lengths: Luvige: 20m, Luxico: 42m, Lualo: 48m, Luveto: 25m, Catofe: 34m, Capungo: 30m, Nhia II: 53m and Caninda: 35m. Also comprising part of the project are the approaches, drainage systems, signage and safety devices.

Namibe Bridges

Eurofinsa construyendo futuro
Project Status: 
Completion Date: 
2014
Industry: 
Type: 
Description: 
Execution of the construction of the bridges located along the Tômbua / Namibe / Bentiaba / Lucira axis in the region of Namibe, Angola, bridges with concrete structure and post-stressed beams, two-way, with berm and handrails, 11 meters in width and of the following lengths: Carunjamba: 168m, Inamangando: 80m, Bentiaba: 220m, Mukungo: 60m and Curoca: 780m. Also comprising part of the project are the approaches drainage systems, signage and safety devices.

La Albuera Bypass

Project Status: 
Completion Date: 
2014
Industry: 
Type: 
Description: 
Execution of a bypass in the municipal district of La Albuera (Badajoz) on the N-432 road from Badajoz to Granada, also enabling connections with the N-435 road from Badajoz to Huelva via a flyover traffic circle

Alcañiz Bypass

Project Status: 
Completion Date: 
2012
Industry: 
Type: 
Description: 
Execution of the “Alcañiz Bypass”, part of KP 331 on National Highway 232 leading to Castellón and ending at KP 137+700 of the same road leading to Zaragoza. This work also includes a connector road located to the west of the town, linking into National Highway 211 leasing to Caspe, as well as a section for connecting to National Highway 420.

Castrelo de Miño Bridge

Project Status: 
Completion Date: 
2015
Industry: 
Type: 
Description: 

Improvement and expansion of the OU-402 road, with access to the newly built bridge to cross the Miño river. Moreover the infrastructure continues on the OU-403 road parallel to the reservoir of Castrelo until "San Paio", nearby of Valdepereira.

Ramón Aguinaga pedestrian bridge

Eurofinsa construyendo futuro.Pasarela de Ramón Aguinaga en la M30, Madrid.Españ
Project Status: 
Completion Date: 
2014
Industry: 
Type: 
Description: 
Construction of a pedestrian bridge over the Avenida de la Paz (M-30) highway connecting Ramón de Aguinaga St. (west side of bridge) to San Marcelo St. (east side)

A-23 Mudéjar Highway: Nueno-Congosto Section (tunnel)

Eurofinsa construyendo futuro. Tramo de carretera  Nueno-Congosto (túnel).Autoví
Project Status: 
Completion Date: 
2015
Industry: 
Type: 
Description: 
Construction of a new section of the A-23 Mudéjar Highway between Nueno and Congosto de Isuela in Huesca Province. This section is approx. 5,000 m long, including a 478-meter excavated tunnel plus 21 meters of false tunnel.

Alicante Airport

Eurofinsa construyendo futuro-Aeropuerto de Alicante, zona de espera aeronaves.E
Project Status: 
Completion Date: 
2015
Industry: 
Type: 
Description: 
Redesign and enlargement of the aircraft holding areas, the aircraft holding area for runway heading 10 being enlarged by 27,500 m2.

Installation the Paruro irrigation system water supply system

Eurofinsa construyendo futuro. Presa en Paruro.Perú
Project Status: 
Completion Date: 
2015
Industry: 
Type: 
Description: 
Construction of a dam 22 m in height by 145 m in length at 4,170.50 m a.s.l. of a 305,916 m3 water storage capacity, enabling water supplied for irrigating a 580-hectar area. This project includes the distribution systems via 25 km of pipeline and the construction of two reservoirs.

Pages

Subscribe to RSS - Infrastructure