Project Status:
Under Development
Country:
Spain
Completion Date:
2020
Industry:
Infrastructure
This project will consist of a hangar totaling 30 meters in height and 6,400 meters of open-bay floor space, making it possible for maintenance to simultaneously be performed on four aircraft. On the exterior, a parking apron and a 2,000 m2 building will be built to be used as storage and office space.
The hangar will be outfitted with cutting-edge technology, including the most advanced MRO (Maintenance, Repair and Operations) equipment. All aspects respecting the environment have been taken into account in the hangar’s construction, including energy-efficient building construction. The hangar is anticipated to be officially opened for use 14 months immediately following the final approval of the project.