October 26, 2016 – Miami, Florida - USA – After construction of access routes began earlier this month, six small hydropower plants being developed for construction in the mountainous region of Ancash, Peru, are closer to being built, according to project developer Hydrika Generation SAC (Hydrika).
The cost to build the plants, which together will have a total installed generating capacity of 55.7 mw, is about U$s 140 million.