Executed

Namibe Bridges

Eurofinsa construyendo futuro
Project Status: 
Completion Date: 
2014
Industry: 
Type: 
Description: 
Execution of the construction of the bridges located along the Tômbua / Namibe / Bentiaba / Lucira axis in the region of Namibe, Angola, bridges with concrete structure and post-stressed beams, two-way, with berm and handrails, 11 meters in width and of the following lengths: Carunjamba: 168m, Inamangando: 80m, Bentiaba: 220m, Mukungo: 60m and Curoca: 780m. Also comprising part of the project are the approaches drainage systems, signage and safety devices.

La Albuera Bypass

Project Status: 
Completion Date: 
2014
Industry: 
Type: 
Description: 
Execution of a bypass in the municipal district of La Albuera (Badajoz) on the N-432 road from Badajoz to Granada, also enabling connections with the N-435 road from Badajoz to Huelva via a flyover traffic circle

Alcañiz Bypass

Project Status: 
Completion Date: 
2012
Industry: 
Type: 
Description: 
Execution of the “Alcañiz Bypass”, part of KP 331 on National Highway 232 leading to Castellón and ending at KP 137+700 of the same road leading to Zaragoza. This work also includes a connector road located to the west of the town, linking into National Highway 211 leasing to Caspe, as well as a section for connecting to National Highway 420.

Castrelo de Miño Bridge

Project Status: 
Completion Date: 
2015
Industry: 
Type: 
Description: 

Improvement and expansion of the OU-402 road, with access to the newly built bridge to cross the Miño river. Moreover the infrastructure continues on the OU-403 road parallel to the reservoir of Castrelo until "San Paio", nearby of Valdepereira.

Alicante Airport

Eurofinsa construyendo futuro-Aeropuerto de Alicante, zona de espera aeronaves.E
Project Status: 
Completion Date: 
2015
Industry: 
Type: 
Description: 
Redesign and enlargement of the aircraft holding areas, the aircraft holding area for runway heading 10 being enlarged by 27,500 m2.

Pages

Subscribe to RSS - Executed