Under Development

Hospital Simbi Continental

Project Status: 
Completion Date: 
2016
Industry: 
Type: 
Description: 
The structure is entirely made ​​of reinforced concrete, with a system of light frames and slabs. Have a level and a construction area of about 3460 m². The hospital has two generators, one for general use 600 kW and a backup for critical areas 45kW located in a platform on the west side of the building. It also has a rainwater tank with a capacity of about 50.000 gallons in the courtyard and an area of ​​recycling and waste management at the east end of the site.

Lycée Touissant Louverture

Project Status: 
Completion Date: 
2015
Industry: 
Type: 
Description: 
This project includes the design and construction of a building for the secondary section, including 24 classrooms, library, computer room, administrative offices. The primary section includes 16 classrooms, library, administrative offices, sanitary facilities, etc. Includes also the construction of a building for laboratories, construction of a cafeteria, auditorium and a multi-field games. Identical reconstruction of the building of the Friendly Lycée Toussant Louverture First phase executed: 2015 Second phase: 2016 Under Development

Manuel Amador Guerrero Hospital

Project Status: 
Completion Date: 
2019
Industry: 
Type: 
Description: 

The new Hospital Manuel Amador Guerrero in Colon, Panama, will serve with several modern features and medical equipment with cutting edge technology; providing services with 477 beds, distributed in four levels.

This hospital will serve in medical sections such as external consult, diagnostic and treatment, administration, and other services; with parking capacity of 980 spaces.

Pages

Subscribe to RSS - Under Development