Equipment
CAMEROON MODULAR BRIDGES
SPORTS CLUB KENYA
Supply of Class I all-in-one means (fire trucks) and Class II all-in-one means (traffic accident response means) for the civil defense and fire departments /MINISTRY OF THE INTERIOR
INTEGRAL WATER POTABILIZATION AND SUPPLY SYSTEM, CUNENE PROVINCE
Construction of a WTP in the province of Cunene for processing Cunene River water into drinking water and distributing it among the towns of Xangongo and Ondjiva by means of a pipeline of approximately 100 km between the reservoirs which were built and the pumping stations for serving all of this region’s inhabitants.
Drinkable water 16,300m3 / day
TRANSPORTATION FARE PAYMENT SYSTEM IN GUAYAQUIL
This system makes it possible to avail of the passenger fare collection and Metrovía System fare payment system managed by way of automated systems (Automated ticket sale and recharging machines, Hardware and Software)
A service for the control of the operation of the Metrovía System bus fleet is also provided, managed by means of the use of automated systems (Hardware, Software and management systems).
REHABILITATION OF PROJECT JEBBA DAM, RIVER NIGER
Rehabilitation of Jebba Spillway discharge channel and the grouting of auxiliary dam No. 3 at Jebba Hydro Power Station:
- Strengthening of the walls of the main and secondary spillway
- Ancillary works (Hydraulic equipment, leak control, parking, VRD)
SUPPLY OF 18 DRINKING WATER TREATMENT PLANTS
COMPACT AND MODULAR EQUIPMENT
- Supply of 8 Mobile Drinking Water Treatment Plants (2E3000)
- Installation of 1 Solar Water Treatment (SWT) Plant with floating intake
- Transmission line from intake to Drinking Water Treatment Plants (2E3000)
- Transmission line from SWT to reservoir
PONFERRADA COURTHOUSE BUILDING EXTENSION
Construction of a public building designed into six floor levels above ground divided into the following general sections:
Pages
