Equipment

COMPACT AND MODULAR EQUIPMENT

Project Status: 
Completion Date: 
2013
Industry: 
Type: 
Description: 
  • Supply of 8 Mobile Drinking Water Treatment Plants (2E3000)
  • Installation of 1 Solar Water Treatment (SWT) Plant with floating intake
  • Transmission line from intake to Drinking Water Treatment Plants (2E3000)
  • Transmission line from SWT to reservoir

WASTEWATER PUMPING STATION - KEUR MASSAR

Project Status: 
Completion Date: 
2015
Industry: 
Type: 
Description: 

Construction work on the wastewater treatment plant and pumping station for the KEUR MASSAR-IVOUANE PEULH repopulation area.

  • The jobs consisted of the construction of 2 kilometers of Drinking Water Lines (160 mm diameter) and two other wastewater lines (diameter 250 mm).
  • The medium-voltage line was also built, at 2.5 km, the pumping station (2,520 m3/d) and the wastewater treatment plant (2,520m3/d).

RESEARCH VESSEL

Project Status: 
Completion Date: 
2010
Industry: 
Type: 
Description: 
Indonesian fisheries training development project. Turnkey construction of the vessel intended for use for research and studies in Indonesia. This project entails the construction, outfitting of the vessel and laboratory plus the training of the personnel. The vessel comprises part of laboratory construction with the following services: electricity, engines, physical, chemical, microbiology and biology.

Residential Building in Uranio Street

Project Status: 
Completion Date: 
2008
Industry: 
Type: 
Description: 
Construction of homes with public protection on land with assessed price and lumber rooms in the Uranio development, in Calle Uranio, 9, in the district Villaverde.

National Highway I

Project Status: 
Completion Date: 
2014
Industry: 
Type: 
Description: 
Rehabilitation and expansion of National Highway RN1, in the following batches: Batch 1, straightening of ascending roads KP12 to KP32, including culverting and asphalting; Batch3, traffic circle at KP12, including finished culverting; Batch 4, repair and re-surfacing of the two-way section Nsilé - Bifoun (62.250 km)

Logistics Platform Bay for Teruel

Project Status: 
Completion Date: 
2007
Industry: 
Type: 
Description: 
Preparation of designs, execution of works and project management for construction works on a logistics bay on the Logistics-Industrial Platform in Teruel

Pages

Subscribe to RSS - Equipment